Project Overview
The Côté Gold Project ("Côté") is a tier one generational asset located within the District of Sudbury, in northeastern Ontario, Canada. Côté is being developed by a joint venture between IAMGOLD Corp. (70%), as the operator, and Sumitomo Metal Mining Co. Ltd. (30%).
The current technical report mine plan outlines a 37,200 tpd open pit operation with estimated average annual production of 495,000 oz Au over the first 6 years of operation, and average annual production of 365,000 oz Au over the 18-year mine life to become one of Canada's largest gold mines.